NEC Express5800/120Lh Guida Utente Pagina 217

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 216
Upgrading Your Server 9-5
PREPARING FOR INSTALLATION AND REMOVAL
Prepare the installation or removal of a component depending on the following procedure:
1. Shut down the OS.
2. Press the POWER switch to turn off the power of the server. (The POWER/SLEEP lamp
goes off.)
3. Pull out all the power cords from the AC inlet on the server.
4. Remove all the cables connected to the server on the rear panel.
5. Make the clearance of 1 m to 2 m in the front and rear sides and left and right sides of the
server.
Vedere la pagina 216
1 2 ... 212 213 214 215 216 217 218 219 220 221 222 ... 313 314

Commenti su questo manuale

Nessun commento